top of page
Infrastructure Works

The company uses the knowledge accumulated in 39 years of history to develop integrated infrastructure solutions. Earthworks, paving, bridges, drainage, dams, among others, are part of its scope.

PROJECTS

highways

br-101-ampliacao_00074929_0-ScaleDownProportional.webp

Construction of a bridge over the Jacuípe River on the BA-099 highway (BA).

airports

Engineering and construction for renovation, expansion and modernization of the passenger terminal, as well as complementary work at Salvador International Airport (BA).

ports

porto 2.webp
porto-do-pécem-155-_1_-edit-9.png

Design, civil and electromechanical construction and instrumentation of the Liquefied Petroleum Gas (LPG) Odorization System for the Port of Suape (PE).

Railways

7174E4AB-364F-4465-89CB-9C30EDA88639 (1).webp
51A4AD86-19FE-4B04-95AC-3BD40BE89B06-4.webp

Electromechanical assembly, laying cables and energizing lines 8, 10 and 11 in São Paulo (SP).

WhatsApp Image 2022-11-28 at 10.26.04.jpg
WhatsApp Image 2022-11-28 at 10_edited.png

Trabalhos e atividades para a conservação da infraestrutura viária em Bogotá.

Gas Distribution

bahiagás venga.webp

Design, construction and installation of natural gas charging and distribution stations in the Metropolitan Region of Salvador (BA).

Termelétrica

Petrobras_rpbc-scaled.jpg

Projects and works under EPC regime (engineering, supplies, construction) of water plants and effluents between 12 and 22m³/s.

IMG_3930_edited.jpg

Design, construction and installation of natural gas charging and distribution stations in the Metropolitan Region of Salvador (BA).

IMG_3950.jpg

Pontes

Captura de tela 2024-01-15 144231.png
Imagem do WhatsApp d];e 2023-08-11 à(s) 14.45.12.jpg

Design, construction and installation of natural gas charging and distribution stations in the Metropolitan Region of Salvador (BA).

Saneamento

Wastewater Treatment - SafeRack - Google Chrome 01_10_2021 13_06_24 (4).webp

Projetos e obras em regime EPC (engenharia, suprimentos, construção) de plantas de água e efluentes entre 12 e 22m³/s.

estoril.jpg

Revisão do projeto, fornecimento, obra exposta em marcha da expansão para 21 metros³/segundo da planta de tratamento de água Francisco Weisner, em Bogotá.

bottom of page